The purpose of this modification is to change the due date for proposals to be considered during the initial round of selection and to clarify BAA07-52 requirements.
The due date for proposals to be considered during the initial round of selection for BAA07-52 (Scalable Network Monitoring) has been extended from September 24, 2007 to October 9, 2007. Full proposals must be submitted per the instructions in the BAA on or before 4:00 p.m. local time on October 9, 2007 in order to be considered during the initial round of selections.
Clarification to BAA requirements: Proposers may respond to this BAA as either a technical performer developing an end-to-end system to provide SNM capabilities (Technical Topic Area 1) or as a test performer to evaluate the technological solutions (Technical Topic Area 2). Performers may NOT respond to both technical topic areas simultaneously.
Point of Contact
Brian Hearing, Program Manager, STO,