HR0011-04-R-0002
Due to the possibility of transcription errors, the official FedBizOpps
announcement takes precedence over this transcription in any disagreement
between the two. The transcription is provided for your convenience only.
General Information
Document type: Modification to a Previous Presolicitation Notice
Solicitation number: HR0011-04-R-0002
Posted date: Sep 01, 2004
Original response date: Sep 20, 2004
Current response date: Sep 20, 2004
Original archive date: Oct 05, 2004
Current archive date: Oct 05, 2004
Classification code: A -- Research & Development
Naics code: 541710 -- Research and Development in the Physical, Engineering,
and Life Sciences
Contracting Office Address
Other Defense Agencies, Defense Advanced Research Projects Agency, Contracts
Management Office, 3701 North Fairfax Drive, Arlington, VA, 22203-1714
Description
The Defense Advance Research Projects Agency hereby issues Amendment 03
to the OAV II RFP to clarify areas of the document. (1) The R&D status
report described in Section C-2, the Progress Report described in section
F, and the Monthly Report Status Report described in Section 1.8 and 2.9
in the SOW all refer to the same report; (2) Each proposal is to provide
Not to Exceed (NTE) prices for the options for both Phases II and III.
Section L-2.1 is updated to reflect this requirement; (3) It is expected
that performance of this effort will involve technologies and data that
are subject to EAR and ITAR. The contractor will be responsible for verifying
their compliance with EAR and ITAR. Contractors should seek advice from
their international trade compliance experts on all ITAR issues. DARPA
will not assume responsibility for ITAR and EAR compliance verification;
(4) Under Key Systems Attributes of the SOO, there is no AUPC requirement
for the GCS. It is envisioned to be a toughbook type PC; (5) Past Performance
questionnaires are due by 5 September 2004; (6) This RFP is assigned a
DPAS rating of DO-A1; (7) The anticipated award date for the Base effort
is approximately 1 October 2004. The anticipated duration of the optional
Phases is identified in Section C-1, Scope of Work; (8) The service ceiling
is to 11,000 ft in the standard atmosphere. When the required 100 ft/min
Vertical Rate of Climb (VROC) at 11,000 ft , the Armys standard VTOL performance
criteria which requires that VROC be calculated at zero forward speed
will be used. The Army's standard hover performance criteria shall be
used to calculate compliance with the OAVII requirement for 100 ft/min
VROC at 11,000 ft. density altitude; (9) Regarding the payload and fixed
equipment associated with their volumes, the payload volume is 385 cubic
inches, and is cylindrical with a diameter of 7 inches and a height of
approximately 10 inches.
Original Point of Contact
Bradford Tousley, DARPA Program Manager, TTO, Phone 000-000-0000, Fax
703-696-2204, Email btousley@darpa.mil
- Mark Bennington, Contracting Officer, Phone (703) 696-2411, Fax (703)
696-2208, Email mbennington@darpa.mil
Current Point of Contact
Bradford Tousley, DARPA Program Manager, TTO, Phone 000-000-0000, Fax
703-696-2204, Email btousley@darpa.mil

Last Updated: 2/21/06
|
 |